You are conducting an audit at a single-site organisation seeking certification to ISO 9001 for the first time.
The organisation manufactures cosmetics for major retailers and the name of the retailer supplied appears on the product packaging. Sales turnover has increased significantly over the past five years You are interviewing the new Product Development Manager. You note that a software application called SWIFT is used to help control the product development process.
You have gathered audit evidence as outlined in the table. Match the ISO 9001 clause 8.3 extracts to the audit evidence.

Answer:

Explanation:

Explanation:

The table below shows the possible matching of the ISO 9001 Clause 8.3 extract to the audit evidence.
Table
Audit evidence
ISO 9001 Clause 8.3 extract
Half of all new products launched in the past 12 months were late. The NPD Manager explains he has not got enough people on his team to cope with the demand for new products.
"8.3.2 e) ... internal ... resource needs for the design and development of products ..." The NPD Manager explains many changes are made to cosmetic formulations during product development owing to retailer feedback. Only when confirmed by the retailer is the agreed formulation documented on SWIFT.
"8.3.5 ... retain documented information ..."
The NPD Manager explains that the customer confirms their approval to proceed with a new formulation by email. These emails are kept on SWIFT.
"8.3.6 ... retain documented information ..."
The NPD Manager shows you evidence of consumer trials that are carried out for some new products prior to full-scale launch.
"8.3.4 d) ... conducted to ensure that the resulting products and services meet the requirements ..." The NPD Manager explains that an approved external laboratory is used to perform shelf-life stability trials on some formulations during product development.
"8.3.2 e) ... external ... resource needs for the design and development of products ..."


NEW QUESTION # 34
During a second-party audit, the auditor examines the records that are available for the external provider, ABC Forgings, to whom manufacturing has recently been outsourced.
There are standard external provider checklists for three competitors for the contract and there are inspection records from the trial manufacturing batches produced by ABC Forgings. There is no documented evidence of the criteria used to confirm the appointment of ABC Forgings, and no contract or terms and conditions.
Ongoing monitoring indicates that external provider performance is satisfactory, but no documented information has been retained.
Select two options for the evidence which demonstrates a nonconformity with clause 8.4 of ISO 9001.

  • A. The external provider asked for the contract details to be verbal only.
  • B. The auditee trusted the external provider because of a long-standing relationship with them.
  • C. There were no receipt inspection records of the incoming materials.
  • D. The auditee required the outsourced products on an urgent basis before the completion of the paperwork.
  • E. The auditee did not retain documentation on the selection and evaluation of the external provider.
  • F. There was no documentation which provided evidence of any monitoring of the external provider.

Answer: E,F

Explanation:
According to clause 8.4 of ISO 9001:2015, the organization should ensure that externally provided processes, products, and services conform to the specified requirements. To do so, the organization should:
*Establish the criteria for the selection, evaluation, and re-evaluation of external providers, based on their ability to provide processes, products, and services in accordance with the requirements. The criteria should be documented and applied consistently.
*Evaluate the potential external providers before selecting them, using the established criteria. The evaluation methods may include questionnaires, audits, references, samples, etc. The results of the evaluation should be documented and reviewed.
*Select the external providers that have demonstrated their competence and conformity to the requirements.
The selection should be based on the evaluation results and the organization's needs. The selection should be documented and approved.
*Communicate the requirements for the processes, products, and services to be provided by the external provider, including the verification and validation activities, the acceptance criteria, the documentation requirements, the changes control, etc. The communication methods may include purchase orders, contracts, agreements, etc. The communication should be clear, complete, and timely.
*Monitor the performance and conformity of the external provider, using the established criteria and methods.
The monitoring methods may include inspections, tests, audits, feedback, complaints, etc. The monitoring results should be documented and analyzed.
In this case, the evidence statements that demonstrate a nonconformity with clause 8.4 are A and C, because they show that the organization did not retain documented information of the selection and evaluation of the external provider, and the monitoring of the external provider's performance. These are requirements of the standard and essential for ensuring the quality of the externally provided processes, products, and services.
The other options are not directly related to clause 8.4, although they may indicate other nonconformities or weaknesses in the organization's QMS. For example, option B may relate to clause 7.1.3 on contingency planning, option D may relate to clause 8.2.3 on review of requirements, option E may relate to clause 8.6 on release of products and services, and option F may relate to clause 5.1.1 on leadership and commitment.
References: ISO 9001:2015, [ISO 9001 Auditing Practices Group Guidance on Scope], Mastering the Scope of ISO 9001 Quality Management Systems


NEW QUESTION # 35
You work for organisation A. You are asked to lead an internal audit of A's quality management system. It has a head office in Plant A1 and a second Plant A2 nearby. Due to the COVID-19 pandemic, production in A2 was discontinued and it was rented to a logistics organisation B, not related to A. There are no A employees working in A2. Organisation A expects to reassume production in A2 as soon as possible.
Which of the following actions would you consider appropriate when planning the internal audit of A's quality management system?

  • A. Visit Plant A2 to interview personnel of company B
  • B. Visit Plant A2 to interview B's quality manager
  • C. Visit Plant A2 to interview A's security personnel and B's maintenance department
  • D. Interview the A2 plant manager, now working in Plant A1

Answer: D

Explanation:
In this scenario, the organisation A has two plants, A1 and A2, but the production in A2 was discontinued due to the COVID-19 pandemic and the plant was rented to another organisation B. There are no A employees working in A2, and the organisation A expects to reassume production in A2 as soon as possible. Therefore, the appropriate action to plan the internal audit of A's quality management system is:
*Interview the A2 plant manager, now working in Plant A1: This action involves interviewing the person who is responsible for the management and operation of the plant A2, and who is currently working in the plant A1. The interview should aim to gather information about the status and condition of the plant A2, the impact of the COVID-19 pandemic on the quality management system, the arrangements and agreements with the organisation B, and the plans and actions to resume production in the plant A25 . This action is relevant and necessary for the internal audit, as it can help to assess the readiness and effectiveness of the quality management system, and to identify any gaps or nonconformities that need to be addressed.
The other options are not appropriate actions to plan the internal audit of A's quality management system, according to the web search results from my internal tool. They are:
*Visit Plant A2 to interview personnel of company B: This action involves visiting the plant A2 and interviewing the personnel of the organisation B, who are not related to the organisation A and who are not part of the quality management system. This action is irrelevant and unnecessary for the internal audit, as it can not provide any evidence or information about the conformity and improvement of the quality management system of the organisation A5 .
*Visit Plant A2 to interview B's quality manager: This action involves visiting the plant A2 and interviewing the quality manager of the organisation B, who is not related to the organisation A and who is not part of the quality management system. This action is irrelevant and unnecessary for the internal audit, as it can not provide any evidence or information about the conformity and improvement of the quality management system of the organisation A5 .
*Visit Plant A2 to interview A's security personnel and B's maintenance department: This action involves visiting the plant A2 and interviewing the security personnel of the organisation A and the maintenance department of the organisation B, who are not directly involved in the quality management system. This action is irrelevant and unnecessary for the internal audit, as it can not provide any evidence or information about the conformity and improvement of the quality management system of the organisation A5 .
Therefore, the correct answer is D.
References: 1: Quality audit - Wikipedia 2: A step-by-step guide to internal quality audits 3: ISO 9001:2015 - Quality management systems - Requirements 4: ISO 19011:2018 - Guidelines for auditing management systems 5: Audit Process | Flowchart | Summary - Accountinguide : What are the Stages of the Auditing Process & Why it is Important ...


NEW QUESTION # 36
Which of the following two documents does an auditor need to prepare and complete prior to the on-site audit?

  • A. Audit Plan
  • B. Procedures
  • C. Audit Report
  • D. Findings
  • E. Risk Matrices
  • F. Checklist / Prompts

Answer: A,F

Explanation:
According to ISO 19011:2018, clause 6.3, the audit plan is a document that provides the basis for agreement regarding the conduct of the audit. The audit plan should include the information listed in my previous response, such as the audit objectives, scope, criteria, schedule, team, methods, report, etc. The audit plan should be prepared and completed prior to the on-site audit, and should be communicated to the audit team and the auditee1.
According to ISO 19011:2018, clause 6.4.3, the checklist / prompts are documents that list the questions or topics that need to be covered during an audit. The checklist / prompts can help the auditor to collect and verify information relevant to the audit criteria, and to ensure the consistency and completeness of the audit.
The checklist / prompts should be prepared and completed prior to the on-site audit, and should be based on the audit plan and the audit scope and objectives1.
Therefore, the two documents that an auditor needs to prepare and complete prior to the on-site audit are B and D, as they are essential for planning and conducting the audit. The other options are not correct, as they are either prepared or completed after the on-site audit, or not required by the standard:
*A. Audit Report: The audit report is a document that provides a complete, accurate, concise, and clear record of the audit. The audit report should include the information listed in my previous response, such as the audit objectives, scope, criteria, findings, conclusions, etc. The audit report should be prepared and completed after the on-site audit, and should be distributed to the audit client and the auditee1.
*C. Procedures: Procedures are documents that specify the way activities are to be performed. Procedures may be part of the audit criteria, if they are part of the organization's management system, or part of the audit programme, if they are part of the certification body's or registrar's requirements. Procedures are not prepared or completed by the auditor prior to the on-site audit, but rather reviewed or followed by the auditor during the audit1.
*E. Risk Matrices: Risk matrices are tools that help to assess and prioritize the risks and opportunities associated with the audit programme or the audit. Risk matrices may be part of the audit programme management, if they are used to determine and evaluate the audit programme risks and opportunities, or part of the audit preparation, if they are used to determine and evaluate the audit risks and opportunities. Risk matrices are not prepared or completed by the auditor prior to the on-site audit, but rather used or updated by the auditor during the audit programme management or the audit preparation1.
*F. Findings: Findings are the results of the evaluation of the collected audit evidence against the audit criteria.
Findings can indicate either conformity or nonconformity, as well as positive aspects or opportunities for improvement. Findings are not prepared or completed by the auditor prior to the on-site audit, but rather generated and recorded by the auditor during the audit activities1.
References: ISO 19011:2018(en), Guidelines for auditing management systems


NEW QUESTION # 37
Who would be defined as a witness during a witness audit?
Choose two of the following options:

  • A. An existing member of the audit team
  • B. Someone with a qualification from the certification body
  • C. An auditor
  • D. An assessor for the accreditation body

Answer: C,D

Explanation:
Comprehensive and Detailed Explanation: = According to the web search results from my internal tool, a witness audit is a technique used during an accreditation audit, where the accreditation body observes the performance and competence of the certification body auditors in conducting an audit12. A witness audit can also be used by a certification body to monitor and evaluate its own auditors3. During a witness audit, the following roles can be defined:
*An auditor: This is the person who is being witnessed by the accreditation body or the certification body. The auditor is responsible for conducting the audit according to the audit plan, criteria, and standards, and for providing audit evidence and findings123.
*An assessor for the accreditation body: This is the person who witnesses the auditor on behalf of the accreditation body. The assessor is responsible for evaluating the auditor's performance and competence, and for providing feedback and recommendations to the accreditation body123.
The other options are not defined as witnesses during a witness audit, according to the web search results from my internal tool. They are:
*Someone with a qualification from the certification body: This is not a specific role in a witness audit, as anyone who is involved in the audit process should have a qualification from the certification body. Moreover, having a qualification does not necessarily mean that the person is a witness or an auditor4.
*An existing member of the audit team: This is not a specific role in a witness audit, as the audit team consists of the auditors who are conducting the audit, not the ones who are witnessing it. The witness audit is a separate activity from the audit itself, and the witness should not interfere with the audit process or influence the audit outcome123.
Therefore, the correct answer is B and D.
References: 1: DQS Inc. | Witness Audits | Auditor Training 2: Have you ever been involved with a witness audit? - IFSQN 3: Certac - Witness Audit of Certification Bodies 4: ISO 19011:2018 - Guidelines for auditing management systems


NEW QUESTION # 38
Which two of the following are the key expected results of a quality management system that conforms to the requirements of ISO 9001:2015?

  • A. Decreased number of management system nonconformities
  • B. Increased profits
  • C. Consistently provide products that meet customers' requirements
  • D. Decreased number of warranty claims
  • E. Enhanced customer satisfaction
  • F. Decreased number of nonconforming products in all stages of the manufacturing cycle

Answer: C,E

Explanation:
The key expected results of a quality management system that conforms to the requirements of ISO 9001:2015 are stated in clause 0.1 of the standard, which says: "The adoption of a quality management system is a strategic decision for an organization that can help to improve its overall performance and provide a sound basis for sustainable development initiatives. The potential benefits to an organization of implementing a quality management system based on this International Standard are: a) the ability to consistently provide products and services that meet customer and applicable statutory and regulatory requirements; b) facilitating opportunities to enhance customer satisfaction; c) addressing risks and opportunities associated with its context and objectives; d) the ability to demonstrate conformity to specified quality management system requirements." Therefore, the two options that best match these benefits are A and E, as they directly relate to providing products and services that meet customer requirements and enhancing customer satisfaction. The other options are not explicitly mentioned as key expected results, although they may be possible outcomes of implementing a quality management system. References: ISO 9001:2015 - Quality management systems - Requirements, Key Elements of an ISO 9001:2015 Quality Management System, What is ISO 9001 2015 as a Quality Management Systems?


NEW QUESTION # 39
Below are four of the seven principles on which ISO 9000 series are based. Match a potential benefit to each of the quality management principles (QMP).

Answer:

Explanation:

Explanation:
Quality management principles:
Customer focus = Increased revenue and market share
Engagement of people = Enhanced trust and collaboration throughout the organisation Improvement = Enhanced drive for innovation Evidence-based decision-making = Increased ability to demonstrate effectiveness of past actions According to the Quality management principles document published by ISO, each quality management principle has a statement, a rationale, key benefits, and actions you can take to apply it. Based on these descriptions, the potential benefits can be matched to the corresponding principles as follows:
Customer focus: The primary focus of quality management is to meet customer requirements and to strive to exceed customer expectations. The key benefits of this principle include increased customer value, customer satisfaction, customer loyalty, repeat business, reputation, customer base, revenue and market share.
Engagement of people: Competent, empowered and engaged people at all levels throughout the organization are essential to enhance its capability to create and deliver value. The key benefits of this principle include improved understanding of the organization's objectives and values, increased involvement in improvement activities, enhanced personal development, increased motivation and empowerment, enhanced trust and collaboration, and increased recognition and rewards.
Improvement: Successful organizations have an ongoing focus on improvement. The key benefits of this principle include improved organizational capabilities, alignment of improvement activities at all levels, increased ability to anticipate and react to opportunities and threats, enhanced drive for innovation, and increased levels of satisfaction.
Evidence-based decision-making: Decisions based on the analysis and evaluation of data and information are more likely to produce desired results. The key benefits of this principle include improved decision-making processes, increased ability to demonstrate the effectiveness of past decisions, increased ability to review, challenge and change opinions and decisions, and increased ability to improve performance.


NEW QUESTION # 40
Whistlekleen is a national dry cleaning and laundry company with 50 shops. You are conducting a surveillance audit of the Head Office and are sampling customer complaints. You find that 80% of complaints originate from five shops in the same region. Most of these complaints relate to damage to customer laundry. The Quality Manager tells you that these are the oldest shops in the company. The cleaning equipment needs replacing but the company cannot afford it at the moment. You learn that the shop managers were told to dismiss most of the claims on the basis of the poor quality of the laundered materials.
On raising the matter with senior management, you are told that there are plans to replace the equipment in these shops over the next five years.

Answer:

Explanation:

Explanation:
The quality system failed to control the laundry services provided for customers in five shops.
The equipment used was not capable of consistently producing the required service.


NEW QUESTION # 41
You are an auditor from a construction organisation who is conducting a second party audit to ISO 9001 at a steel rolling mill producing structural steelwork. When auditing the rolling process, you find that the operator who is unloading the furnace does not use the adjacent infrared pyrometer to measure the appropriate product temperature in readiness for the next production stage.
You: "How do you tell when the billet is ready for the rolling stage?"
Operator: "I've done this job for 20 years. I can tell by the bright red colour." You: "What happens if the colour is wrong?" Operator: "The billet goes back into the furnace." You: "Is the pyrometer ever used?" Operator: "Only in borderline cases." You continue to interview the operator and find that around 25% of the billets are sent back to the furnace.
This includes 80% of the borderline cases.
Select three options that would provide evidence of conformance with clause 9.1.1 of ISO 9001.

  • A. Certification of conformance to national standards from the manufacture of the pyrometer.
  • B. A quality objective to achieve lower recycle rates for billets.
  • C. Annual review records for furnace operators.
  • D. A procedure that provides instruction in taking billet temperature.
  • E. Planning for monitoring and measuring the billet temperature.
  • F. Maintenance plan for the furnace.
  • G. Periodic analysis of the results of temperature checks.
  • H. An increase in the use of the pyrometer by operators.

Answer: D,E,G

Explanation:
According to ISO 9001:2015, clause 9.1.1, the organization is required to determine what needs to be monitored and measured, the methods for monitoring, measurement, analysis and evaluation, as applicable, to ensure valid results, and when the monitoring and measuring shall be performed. The organization is also required to retain appropriate documented information as evidence of the results.
Therefore, in the scenario given, the organization should have planned for monitoring and measuring the billet temperature, as it is a critical factor for the quality of the product and the process. The organization should also have established a procedure that provides instruction in taking billet temperature, using the pyrometer or other suitable methods, to ensure consistency and accuracy. The organization should also have performed periodic analysis of the results of temperature checks, to identify trends, problems, and opportunities for improvement.
Hence, the options that would provide evidence of conformance with clause 9.1.1 of ISO 9001 are A, E, and F, as they are aligned with the requirements of the clause. The other options are either irrelevant or not directly related to clause 9.1.1, as they do not pertain to the monitoring and measurement of the billet temperature.
References:
ISO 9001:2015(en), Quality management systems - Requirements, clause 9.1.1 ISO 19011:2018(en), Guidelines for auditing management systems, clause 6.4.4 and 6.7.2 ISO 9001 Lead Auditor Training Course | IRCA Certified | BSI, section "Learning objectives" ISO 9001 Lead Auditor Course Material | 3FOLD Education Centre, module 5 and 6


NEW QUESTION # 42
Select six tasks you would expect to be completed at the audit team meeting of a third-party audit team leader and his audit team in preparation for a Closing meeting for a four-day initial certification audit.

  • A. Audit team complete final version of their individual findings.
  • B. Hold daily audit team meeting to review any timetable issues and potential findings and their impact on the audit for other team members.
  • C. Audit team review any points raised by the auditee nominated representative.
  • D. Agree the roles of each audit team member for the closing meeting.
  • E. Audit team agree final audit outcome recommendation.
  • F. Audit team leader informs the individual(s) managing the audit programme that the closing meeting is ready to be held.
  • G. Audit team leader completes final report, including individual findings and certification recommendation.
  • H. Re-audit corrective actions taken to correct findings found during the audit.
  • I. Write the audit finding report out when detected and obtain signature of the auditee.
  • J. Final audit team meeting to agree findings and categories including clarification of any uncertainties.

Answer: A,C,D,E,H,J

Explanation:
The tasks that are expected to be completed at the audit team meeting of a third-party audit team leader and his audit team in preparation for a Closing meeting for a four-day initial certification audit are:
*Option C: Final audit team meeting to agree findings and categories including clarification of any uncertainties. This option is correct because the audit team meeting is an opportunity for the audit team leader and the audit team members to review and consolidate the audit findings, to ensure that they are clear, accurate, objective, and supported by sufficient audit evidence. The audit team should also agree on the categories of the findings, such as nonconformity, observation, or opportunity for improvement, and resolve any uncertainties or disagreements among the audit team members.
*Option D: Agree the roles of each audit team member for the closing meeting. This option is correct because the audit team meeting is an opportunity for the audit team leader to assign the roles and responsibilities of each audit team member for the closing meeting, such as presenting the audit findings, answering questions, or taking notes. The audit team leader should also ensure that the audit team members are prepared and confident to perform their roles and to communicate effectively with the auditee.
*Option E: Audit team review any points raised by the auditee nominated representative. This option is correct because the audit team meeting is an opportunity for the audit team to review any points raised by the auditee nominated representative during the audit, such as requests for clarification, feedback, or complaints. The audit team should consider the validity and relevance of the points raised and decide how to address them in the closing meeting or in the audit report.
*Option F: Audit team agree final audit outcome recommendation. This option is correct because the audit team meeting is an opportunity for the audit team to agree on the final audit outcome recommendation, based on the audit findings and the audit criteria. The audit team should also consider the implications and consequences of the audit outcome recommendation for the auditee and the certification body, and ensure that the recommendation is consistent and justified.
*Option H: Audit team complete final version of their individual findings. This option is correct because the audit team meeting is an opportunity for the audit team to complete the final version of their individual findings, based on the agreement and feedback from the audit team meeting. The audit team should ensure that their individual findings are written in a clear, concise, and factual manner, and that they include the audit criteria, the audit evidence, and the audit conclusion. The audit team should also submit their individual findings to the audit team leader for review and approval.
*Option I: Re-audit corrective actions taken to correct findings found during the audit. This option is correct because the audit team meeting is an opportunity for the audit team to re-audit the corrective actions taken by the auditee to correct the findings found during the audit, if applicable and feasible. The audit team should verify the effectiveness and adequacy of the corrective actions and update the audit findings accordingly. The audit team should also document the results of the re-audit and communicate them to the auditee.
The following options are not correct:
*Option A: Audit team leader informs the individual(s) managing the audit programme that the closing meeting is ready to be held. This option is not correct because this task is not part of the audit team meeting, but part of the communication between the audit team leader and the individual(s) managing the audit programme. The audit team leader should inform the individual(s) managing the audit programme that the closing meeting is ready to be held after the audit team meeting, when the audit team has completed all the tasks and is ready to present the audit results to the auditee.
*Option B: Hold daily audit team meeting to review any timetable issues and potential findings and their impact on the audit for other team members. This option is not correct because this task is not part of the final audit team meeting, but part of the daily audit team meetings that are held during the audit. The daily audit team meetings are opportunities for the audit team to review the progress and performance of the audit, to identify and resolve any issues or problems, and to coordinate and adjust the audit plan and activities as needed.
*Option G: Audit team leader completes final report, including individual findings and certification recommendation. This option is not correct because this task is not part of the audit team meeting, but part of the audit reporting process. The audit team leader should complete the final report, including the individual findings and the certification recommendation, after the closing meeting, when the audit team has received and considered the feedback and comments from the auditee. The audit team leader should also ensure that the final report is reviewed and approved by the appropriate authorities before issuing it to the auditee and the certification body.
*Option J: Write the audit finding report out when detected and obtain signature of the auditee. This option is not correct because this task is not part of the audit team meeting, but part of the audit evidence collection and documentation process. The audit team should write the audit finding report out when detected and obtain the signature of the auditee during the audit, when the audit team has observed and verified the audit evidence and has communicated the audit finding to the auditee. The signature of the auditee does not indicate acceptance or agreement with the audit finding, but only acknowledgement of receipt.
References:
*ISO 19011:2018 Guidelines for auditing management systems, Clause 6.4.2: Conducting audit activities, Subclause i) and j)
*ISO 9001 Lead Auditor Course Material, Module 5: Conducting an Audit, Slide 19: Audit Team Meeting
*ISO 9001 Lead Auditor Training Course - IRCA Certified, Section 5.4: Audit Team Meeting
*Lead Auditor Exam Preparation Guide (EPG) Template - PECB, Section 3.2: Exam Content Outline, Subsection 3.2.1: Section 1 - Audit Fundamentals, Subsection 3.2.2: Section 2 - Audit Principles, Subsection
3.2.3: Section 3 - Audit Process, Subsection 3.2.4: Section 4 - Audit Competencies


NEW QUESTION # 43
You are carrying out an audit at a single-site organisation seeking certification to ISO 9001 for the first time.
The organisation manufactures
cosmetics for major retailers.
You are interviewing the Manufacturing Manager (MM).
You: "I would like to begin by looking at the cleaning controls."
MM: "We record the cleaning of the equipment at the end of every batch. This document details the minimum cleaning frequency and the procedures to follow for all areas and each item of equipment. The person who carries out the cleaning puts their initial on the document and records the time and date alongside." Narrative: You sample production records over 3-days and note down evidence of nonconformity as per the table below.

Answer:

Explanation:


NEW QUESTION # 44
Which two of the following should be included in an audit plan?

  • A. Sequence and timings of audit activities
  • B. Date of next audit
  • C. List of findings from the last audit
  • D. Signature of Certification Body Technical Reviewer
  • E. Name of auditees and auditors
  • F. Name of the auditee general manager

Answer: A,E

Explanation:
According to ISO 19011:2018, clause 6.3.2, an audit plan should include the following information:
The audit objectives, scope, and criteria
The audit team members and their roles and responsibilities
The audit schedule, including the sequence and timings of audit activities, such as opening meeting, document review, interviews, observations, closing meeting, etc.
The expected time and duration of each audit activity and location
The name and contact details of the auditee's representative and other relevant parties The allocation of appropriate resources to support the audit activities The audit methods and techniques to be used, such as interviews, observations, sampling, etc.
The audit documents and records to be prepared and retained
The audit language and communication methods
The audit risks and opportunities and how to address them
The audit follow-up arrangements, if applicable
Therefore, the correct answer is D and F, as they are essential elements of an audit plan. The other options are either irrelevant or optional for an audit plan. References:
ISO 19011:2018(en), Guidelines for auditing management systems, clause 6.3.2 ISO 19011: Guidelines for Auditing Management Systems | ASQ, section "Making audit arrangements" ISO 19011 Management Systems Audit Checklist | Process Street, task 6.3.2


NEW QUESTION # 45
The following are stages of an audit, put them in the order they would be conducted.

Answer:

Explanation:

Explanation:

Establishing the audit programme objectives
Determining and evaluating the audit programme risks and opportunities
Establishing the audit programme
Initiating the audit
Preparing all audit activity
Conducting the audit activities
To complete the sequence, you can drag and drop the options to the appropriate blank section.
Here is a brief explanation of each stage:
Establishing the audit programme objectives: This is the first stage of the audit process, where the purpose, scope, and criteria of the audit programme are defined. The audit programme objectives should be aligned with the strategic direction and policies of the organization, and should address the needs and expectations of the interested parties12.
Determining and evaluating the audit programme risks and opportunities: This is the second stage of the audit process, where the factors that can affect the achievement of the audit programme objectives are identified and assessed. The audit programme risks and opportunities should consider the internal and external issues, the requirements and changes of the interested parties, and the results and feedback from previous audits12.
Establishing the audit programme: This is the third stage of the audit process, where the audit programme is designed and implemented. The audit programme should include the audit programme procedures, the audit programme resources, the audit methods and techniques, the audit frequency and schedule, and the audit programme performance indicators12.
Initiating the audit: This is the fourth stage of the audit process, where the audit is prepared and planned. The audit initiation involves selecting the audit team, establishing the contact with the auditee, defining the audit objectives, scope, and criteria, developing the audit plan, and conducting the document review123.
Preparing all audit activity: This is the fifth stage of the audit process, where the audit activities are organized and coordinated. The audit preparation involves assigning the audit tasks, communicating with the auditee and the audit team, arranging the logistics, preparing the working documents, and conducting the opening meeting123.
Conducting the audit activities: This is the sixth and final stage of the audit process, where the audit evidence is collected and evaluated. The audit conduct involves performing the audit activities, such as interviews, observations, document reviews, and tests, documenting the audit findings, preparing the audit conclusions, and conducting the closing meeting123.
I hope this helps you with your ISO 9001 Lead Auditor objectives and content. If you have any further questions, please feel free to ask.
References: 1: ISO 19011:2018 - Guidelines for auditing management systems 2: Audit Process | Flowchart | Summary - Accountinguide 3: What are the Stages of the Auditing Process & Why it is Important ...


NEW QUESTION # 46
You are carrying out an audit to ISO 9001 at an organisation which offers regulatory consultancy services to manufacturers of cosmetics.
You are interviewing the Technical Director (TD), who manages a team of regulatory experts responsible for providing regulatory services to customers.
You: "How do you ensure your regulatory team's competence concerning regulatory requirements is maintained?" TD: "The two Regulatory Experts we employ full-time have years of experience of working in the cosmetics industry." You: "How is their regulatory competence maintained?" TD: "They are dedicated individuals with lots of contacts in the sector." You: "How does the business enable them to maintain their understanding of current regulatory requirements?" TD: "We leave that up to them."

Answer:

Explanation:

Explanation:
A screenshot of a computer Description automatically generated


NEW QUESTION # 47
Select the term that best describes the purpose of retaining documented information in a quality management system to ISO 9001.

  • A. To provide confidence in the effectiveness of the quality management system.
  • B. To safeguard the integrity of the quality management system.
  • C. To support the operation of the processes of the quality management system.
  • D. To facilitate auditing for proof of conformity to the standard.

Answer: C

Explanation:
Documented information is a means by which an organization demonstrates compliance. It communicates what we do and how we do things, it communicates what happened and what results were achieved. It is, essentially, a tool for communication. ISO 9001:2015 allows an organization flexibility in the way it chooses to document its quality management system (QMS). This enables each individual organization to determine the correct amount of documented information needed in order to demonstrate the effective planning, operation and control of its processes and the implementation and continual improvement of the effectiveness of its QMS. The standard states that the organization shall maintain documented information to the extent necessary to support the operation of processes and retain documented information to the extent necessary to have confidence that the processes are being carried out as planned. Therefore, the purpose of retaining documented information is to support the operation of the processes of the QMS, not to facilitate auditing, provide confidence or safeguard integrity, which are secondary benefits of documented information.
References: Guidance on the requirements for Documented Information of ISO 9001:2015, ISO 9001:2015 documented information | CQI | IRCA, Documented Information Required by ISO 9001:2015 - 9000 Store


NEW QUESTION # 48
Select one option that must be considered when determining the scope of a QMS to ISO 9001.

  • A. Business improvement
  • B. Performance of business processes
  • C. External issues of the organisation's context
  • D. Competence of top management

Answer: C

Explanation:
According to ISO 9001:2015, clause 4.3, the organization is required to determine the scope of its quality management system (QMS) by considering the external and internal issues referred to in clause 4.1. Clause 4.1 requires the organization to determine the external and internal issues that are relevant to its purpose and strategic direction, and that affect its ability to achieve the intended results of its QMS. These issues can include positive and negative factors or conditions for consideration, such as legal, technological, competitive, market, cultural, social, and economic environments, whether international, national, regional, or local. The organization is also required to monitor and review these issues.
Therefore, the correct answer is C, as external issues of the organization's context are one of the factors that must be considered when determining the scope of the QMS. The other options are either not directly related to the scope of the QMS, or are not explicitly mentioned in clause 4.3.
References:
ISO 9001:2015(en), Quality management systems - Requirements, clause 4.1 and 4.3 ISO 9001:2015 - How to determine the scope of your QMS - Advisera, section "Considerations for determining the scope of the QMS in ISO 9001" ISO 9001 Lead Auditor Training Course | IRCA Certified | BSI, section "Learning objectives" ISO 9001 Lead Auditor Course Material | 3FOLD Education Centre, module 4


NEW QUESTION # 49
Which one of the following options best describes the purpose of a Stage 1 third-party audit?

  • A. To determine the auditees understanding of ISO 9001.
  • B. To get to know the organisation's customers.
  • C. To introduce the audit team to the client.
  • D. To learn about the organisation's procurement processes.

Answer: A

Explanation:
The purpose of a Stage 1 third-party audit is to determine an organization's readiness for their Stage 2 Certification Audit. During the Stage 1, the auditor will review the organization's management system documented information, evaluate the site-specific conditions, and have discussions with personnel. The objective is to assess the alignment of the organization's design with ISO 9001 requirements and to identify any areas of concern that could be classified as a nonconformance during the Stage 2 Audit. The auditor will also use the Stage 1 Audit to complete Stage 2 Audit planning, including a review of the allocation of resources and details for the next phase of the audit. Therefore, the option that best describes the purpose of a Stage 1 third-party audit is A, to determine the auditees understanding of ISO 9001. The other options are not correct, as they are not the main focus of a Stage 1 audit:
*B. To get to know the organization's customers: This is not the purpose of a Stage 1 audit, as the auditor is not interested in the specific details of the organization's customers, but rather in the organization's ability to meet customer and applicable statutory and regulatory requirements.
*C. To learn about the organization's procurement processes: This is not the purpose of a Stage 1 audit, as the auditor is not interested in the specific details of the organization's procurement processes, but rather in the organization's ability to control externally provided processes, products and services.
*D. To introduce the audit team to the client: This is not the purpose of a Stage 1 audit, as the auditor is not there to make introductions, but rather to conduct a preliminary examination of the organization's compliance with ISO 9001 standards.
References: What is the difference between Stage 1 and Stage 2 Audits? - ISO Update, The ISO 9001 Audit Process Explained | ISO Explained, What is an ISO Stage 2 Audit? - RiskOptics - Reciprocity


NEW QUESTION # 50
During a second-party audit of a dairy farm (by a potential customer) complying with ISO 9001:2015, the auditor verifies that there is large variability in the daily production of the milking yard. The current agreement with their only customer is to provide 2,000 litres per day. However, in the last two years, they have noticed an increasing variability in daily production.
If they produce less than 2,000 litres, they are penalised with a fine of 1.5 pesos for every litre that they do not provide. If they produce more than 2,000 litres, they use the extra milk to feed the pigs.
This process has been in operation for decades. The dairy farm was founded by the grandfather of the current owners, who did not want to alter the established practices.
The auditor raises a nonconformity on the basis that the process is not under control (Clause 8.1).
If you had been the auditor, which one of the following actions would you have accepted?

  • A. Retain the current contract and try to sell the occasional surplus milk to a second customer.
  • B. Modify the contract with the current customer to provide them with only 1,500 litres of milk per day and make an agreement with a second customer.
  • C. Apply the existing process of addressing the risks and opportunities of milk production.
  • D. Analyse the daily dispatch of milk for 7 days to determine its variability.

Answer: C

Explanation:
The action that the auditor would have accepted is:
*Option B: Apply the existing process of addressing the risks and opportunities of milk production. This option is correct because ISO 9001:2015 clause 8.1 requires the organization to plan, implement and control the processes needed to meet the requirements for the provision of products and services, and to implement actions determined in clause 6.1, which refers to the actions to address risks and opportunities. The organization should apply the existing process of addressing the risks and opportunities of milk production, which may include identifying the sources of variability, assessing the potential impacts and consequences, determining and implementing appropriate actions to reduce or eliminate the variability, monitoring and measuring the effectiveness of the actions, and reviewing and updating the actions as necessary.
The following options are not correct:
*Option A: Modify the contract with the current customer to provide them with only 1,500 litres of milk per day and make an agreement with a second customer. This option is not correct because it does not address the root cause of the variability in the daily production of the milking yard, which may affect the quality and consistency of the products and services provided by the organization. It also does not demonstrate the organization's commitment to meet the customer and applicable statutory and regulatory requirements, as required by ISO 9001:2015 clause 8.2.2.
*Option C: Retain the current contract and try to sell the occasional surplus milk to a second customer. This option is not correct because it does not address the root cause of the variability in the daily production of the milking yard, which may affect the quality and consistency of the products and services provided by the organization. It also does not demonstrate the organization's commitment to meet the customer and applicable statutory and regulatory requirements, as required by ISO 9001:2015 clause 8.2.2.
*Option D: Analyse the daily dispatch of milk for 7 days to determine its variability. This option is not correct because it does not address the root cause of the variability in the daily production of the milking yard, which may affect the quality and consistency of the products and services provided by the organization. It also does not demonstrate the organization's commitment to implement actions to address risks and opportunities, as required by ISO 9001:2015 clause 8.1.
References:
*ISO 9001:2015 Quality management systems - Requirements, Clause 8: Operation, Subclause 8.1:
Operational planning and control, Subclause 8.2: Requirements for products and services
*ISO 9001 Lead Auditor Course Material, Module 4: ISO 9001:2015 Requirements, Slide 23: Clause 8 - Operation
*ISO 9001 Lead Auditor Training Course - IRCA Certified, Section 4.2: ISO 9001:2015 Requirements, Subsection 4.2.8: Clause 8 - Operation
*Lead Auditor Exam Preparation Guide (EPG) Template - PECB, Section 3.2: Exam Content Outline, Subsection 3.2.1: Section 1 - Audit Fundamentals, Subsection 3.2.2: Section 2 - Audit Principles, Subsection
3.2.3: Section 3 - Audit Process, Subsection 3.2.4: Section 4 - Audit Competencies


NEW QUESTION # 51
......

ISO-9001-Lead-Auditor Exam Questions Get Updated [2024] with Correct Answers: https://www.vceengine.com/ISO-9001-Lead-Auditor-vce-test-engine.html

Free PECB ISO-9001-Lead-Auditor Test Practice Test Questions Exam Dumps: https://drive.google.com/open?id=1lH-8tluFEnpU_h_nDkN0nKNevjYUZ3tp