
CT-TAE Actual Questions 100% Same Braindumps with Actual Exam!
CT-TAE Study Material, Preparation Guide and PDF Download
The ISTQB CT-TAE exam consists of 40 multiple-choice questions, and candidates have 90 minutes to complete it. To pass the exam, candidates must score at least 65%. CT-TAE exam is administered by accredited training providers and can be taken online or in-person at an exam center. The CT-TAE certification is valid for five years, after which candidates must renew their certification by taking a recertification exam.
NEW QUESTION # 47
Which of the following is considered a disadvantage of test automation?
- A. Test automation can be a distraction from the objective of finding bugs
- B. Slower feedback on the quality of the system.
- C. Tests are more likely to have operator errors.
- D. Automated exploratory testing is difficult to implement
Answer: B
NEW QUESTION # 48
Your project is transitioning from manual to automated testing. You have decided to implement a pilot project so that lessons learned can inform future time estimates and schedules.
Which two of the following represent the types of test cases that are MOST suited to a test automation pilot project?
a) High added value test cases that require little effort to automate.
b) Test that are run infrequently as these will be simpler to automate
c) Reliability test cases that can show added value soon
d) Technically challenging test cases to provide the best validation of manual test conversion e) Tests that are least Important to the business as these are safer to trial
- A. a and b
- B. c and e
- C. b and d
- D. a and c
Answer: D
NEW QUESTION # 49
Which of the following attributes should NOT be included in a test execution report associated with a suite of automated tests?
- A. System/Application under test and its version
- B. Defect clusters identified during test execution
- C. Environment in which the tests have been executed
- D. Summary of the test execution results
Answer: B
NEW QUESTION # 50
If model-based testing has been selected for the overall test automation approach for a project, how does that influence the layers of the TAA?
- A. No adaptation will be needed because the interfaces will be defined by the model
- B. There will be no need to design the tests for the API because those will be covered by the model
- C. All layers are used, but the test generation layer will be automated based on the defined model
- D. There will be no need for the execution layer
Answer: C
NEW QUESTION # 51
You are reviewing the testability of your SUT.
Which of the following BEST refers to the characteristic of OBSERVABILITY?
- A. The ability to exercise the SUT by entering inputs, triggering events and invoking methods
- B. The ability of the SUT to prevent unauthorized access to its components or data.
- C. The ability to identify states, outputs, intermediate result and error messages in the SUT
- D. The ability of the SUT to perform its intended function for a specified period of time
Answer: C
NEW QUESTION # 52
You have been asked to determine a TAS for a new release of a SUT, test should be automated wherever. The new release will consist of 5 new interfaces and an amendment to 3 existing interfaces. The new and amended interface will be deliver incrementally in 3 sprints, each lasting 2 weeks.
What would be the BEST Test Automation Solution (TAS) design in this scenario?
- A. Automate a test at once level, component level, Create customized interface/test hooks for this level where the interface has not yet been developed or amended.
- B. Automate the tests at two levels, Component and System level. Create customized hooks at Component level for interface not yet developed or amended. Only use the newly developed or amended interfaces to test at System level.
- C. Automate tests at one level only, System level. Use only the newly developed interfaces and do not create any customized interfaces/test hooks.
- D. Automate tests at both Component and System Level. Only do this automation once every interface has been fully developed or amended and manual testing has completed successfully.
Answer: D
NEW QUESTION # 53
You have investigated a new tool which enables the modelling of the SUT and can then generate test cases either manually or automatically. You have convinced your managers that the best way forward is to conduct a pilot project for this tool. You need to select a project to use for the pilot. You have the choice of the following projects:
Project A: A two-year project that is critical to the business and is currently in the requirement phase. This project is for a new e-commerce web site and is mostly being developed "in-house" although the payment system is being developed and delivered by a 3rd party provider.
Project B: A safety critical application for software to drive and park cars.
Project C: An upgrade to an important HR timesheet tracking application that will be available on a desktop and mobile application. This is a 1-month project developed in-house.
Project D The payment system from project A.
Which project would be BEST for the pilot?
- A. Project C because it is a short, low priority project but is important.
- B. Project A because it is a large project and has high visibility and is in the requirement phase.
- C. Project B because it is a safety critical system and has high visibility.
- D. Project D because it is a small part of a larger project and will help show the tool's capabilities.
Answer: D
NEW QUESTION # 54
What are the four horizontal layers of the gTAA?
- A. Test generation, test definition, test execution, test adaptation
- B. Test generation, test execution, test definition, test APIs
- C. Test adaptation, test execution, test design, test definition
- D. Test definition, test execution, test reporting, test adaptation
Answer: A
NEW QUESTION # 55
Consider a TAS that is going to be deployed for the first time. The TAS requires share resources and run it its own test environment. The infrastructure for the TAS has been created along with maintenance procedures. It is very unlikely the TAS will be required to work in other target Environments. There is a high-risk that when the TAS is deployed in its own test environment, a number of existing application will no longer work because of conflicts with the existing shared resources.
Which of the following activities would you expect to be MOST effective at mitigating the risk associated with the first deployment of the TAS?
- A. Testing the TAS for its ability to be implemented in other target test environments.
- B. Testing the TAS for application compatibility issues in the target environment
- C. Testing the TAS for ITS ability to run a shared test environment
- D. Testing the TAS for regressions due to optimization that fix non-functional issues.
Answer: A
NEW QUESTION # 56
Consider a TAS that exclusively uses the APIs of a SUT. To make this work, significant changes have been required to the SUT by adding a set of dedicated test interfaces to the APIs. All the automated tests will use these test interfaces when interacting with the SUT. Assume that you are currently verifying the correctness of the automated test environment and test tool setup.
Which of the following would you expect to be the MOST specific risk associated with this scenario?
- A. The automated test cases will not contain the expected result
- B. False alarms, that are unlikely to occur in the real world, will be observed during testing
- C. The process of configuring the TAS will be error-phone due to manual intervention
- D. The connectivity from the TAS to the dedicated test interfaces will not work
Answer: B
NEW QUESTION # 57
A TAS uses a commercial test automation tool and the default logs generated by the inconsistent formats such as different types of messages (pass/fail steps, screenshots, warnings, etc.) To solve this issue some custom logging functions have been created from the test scripts, making it possible to log the different types of messages with the same format. However, this may cause a problem due to excessive size of the logs which can make it difficult to find the required information. Assume that all the default logs will be disabled when running the automated tests and that some tests will not generate excessively sized logs.
Which of the following represents the BEST suggestion for implementing the custom logging functions?
- A. Implement the custom logging functions to redirect the logs to multiple files
- B. Implement the custom logging functions without saving timestamps
- C. Implement the custom logging functions to support different levels of tracing
- D. Implement the custom logging functions without saving stack traces
Answer: C
NEW QUESTION # 58
As a TAE you are evaluating a functional test automation tool that will be for several projects within your organization. The projects require that tool to work effectively and efficiently with SUT's in distributed environments. The test automated tool also needs to interface with other existing test tools (test management tool and defect tracking tool.) The existing test tools subject to planned updates and their interface to the test automated tool may not work property after these updates.
Which of the following are the two LEAST important concerns related to the evaluation of the test automation in this scenario?
Is the test automation tool able to launch processors and execute test cases on multiple machines in different environments?
Does the test automation tool support a licensing scheme that allows accessing different sets?
Does the test automation tool have a large feature set, but only part of the features will be sets?
Do the release notes for the planned updates on existing specify the impacts on their interfaces to other tools?
Does the test automation tool need to install specific libraries that could impact the SUT?
- A. A and E
- B. A and C
- C. B and E
- D. C and D
Answer: C
NEW QUESTION # 59
Your organisation has successfully implemented a Test Automaton Solution (TAS) for a new project which has since been delivered into production via a number of sprints. A series of maintenance releases are now planned.
Some improvements were made to the Test Automation Architecture (TAA) as a result of feedback from the early sprints. The TAA improvements affected the TA, and the TAS was changed for the final sprint.
The new version of the TAS was generally well received but some performance and usability issues were encountered with the TAS which have yet to be addressed.
The test automation engineers supporting the maintenance releases must decide whether to use the enhanced TAS or the version that was used successfully for previous sprints.
What is the BEST action to take next?
- A. Use the new version because, despite some issues, it works, and the live system should not be tested using a different TAS.
- B. Perform an analysis of risks versus benefits for the enhanced TAS and then decide which version to use.
- C. Use the new version of the TAS for the first maintenance release on a trial basis. If issues are encountered, switch to the previous version for later releases until the issues are resolved.
- D. Use the previous version because this was proven to work. It will be too risky to use the new version, with unresolved issues, for a live system.
Answer: C
NEW QUESTION # 60
What represents good practice when automating a manual regression test suite?
- A. All existing manual tests should be decomposed into several smaller automated tests to reduce functional overlap.
- B. Once a manual test has been automated, execute it immediately to Identify whether it operates correctly.
- C. Test data shared between tests should, where feasible, be stored and accessed from a single source to avoid duplication or introduction of error.
- D. Remove inter-dependencies between tests to reduce automation failures and costly error analysis.
Answer: B
NEW QUESTION # 61
Consider a TAS associated to dynamically changing software frequent releases. Your goal is to determine the amount of effort required to maintain the automated tests of the regression test suite for each new release of the SUT.
What is the MOST important metric to collect to achieve your goal?
- A. The number of automated tests requiring maintenance, for each new release of the SUT.
- B. The number of automated tests which fail because of a single software defect, for each new release of the SUT
- C. The time it takes to execute all the automated tests, for each new release of the SUT.
- D. The code coverage achieved with the automated tests, for each new release of the SUT
Answer: B
NEW QUESTION # 62
You are implementing a TAS for a system that has been live for over three years, using a hybrid waterfall and agile lifecycle. Live updates are made on a monthly basis.
There is no test team, with developers designing and executing unit and integration tests with some degree of automation and business analysts designing and executing manual tests at the system level. No formal test process exists, although the system has proved relatively stable for most of the time.
Unfortunately, the last two monthly releases were problematic with regression defects found in production. Your priority is the automation of functional regression tests at the system level, the budget for this has been approved by project stakeholders.
The Business Analysts have identified which test cases are most suitable for regression. You must use the organisation's long standing commercial automation tool which has passed a proof of concept in the platform for the system in question.
Which of the following suitability criteria needs the MOST attention for the TAS?
- A. Technical planning in support of ROI analysis
- B. Compatibility and tool support
- C. Frequency of use.
- D. Maturity of the test process
Answer: B
NEW QUESTION # 63
You are currently designing the TAA of a TAS. You have been asked to adopt an approach for automatically generating and executing test cases from a model that defines the SUT. The SUT is a state-based and event-driven that is described by a finite-state machine and exposes its functionality via an API. The behavior of the SUT depends on hardware and communication links that can be unreliable.
Which of the following aspects is MOST important when designing the TAA in this scenario?
- A. Looking for tools that allows direct denoting of exceptions and actions depending on the SUT events.
- B. Looking for tools that allow performing setup and teardown of the test suites and the SUT.
- C. Adopting a test definition strategy based on classification tree coverage for the test definition layer.
- D. Adopting a test definition strategy based on use case/exception case coverage for the definition layer.
Answer: B
NEW QUESTION # 64
Which of the following is NOT a technical design consideration for a TAA?
- A. Standards and Legal requirements, e.g data privacy
- B. Availability of interfaces for the SUT to be testable
- C. The number of users for the SUT
- D. Data used by the SUT, e.g configuration, users
Answer: C
NEW QUESTION # 65
Consider A TAS for testing a desktop application via its GUI. All the test cases of the automated test suite contain the same identical sequences of steps at the beginning (to create the necessary objects when doing a preliminary configuration of the test environment and at the end (to remove everything created -specifically for the test itself during the preliminary configuration of the test environment). All automated test cases use the same set of assertion functions from a shared library, for verifying the values in the GUI fields ( e.g text boxes).
What is the BEST recommendation for improving the TAS?
- A. Adopting a set of standard verification methods for use by all automated tests
- B. Improving the architecture of the application in order to improve its testability
- C. Implementing keywords with higher level of granularity
- D. Implementing standard setup and teardown functions at test case level
Answer: C
NEW QUESTION # 66
You identified a suitable project to pilot an automation tool and planned and conduced a pilot. The pilot has been successful and tool Is being deployed within your organization, with a plan to increase tool use by the one project at a time. During this rollout some test processes will be changed slightly to gain additional benefits from using the tool.
In the pilot project, a small set of manual tests were automated for the first time. You are currently monitoring the test automation efficiency and this reveals that the automation regime for the tests is not yet mature.
Which of the following statements is TRUE?
- A. The pilot project should have been critical so that maximum benefits were delivered
- B. The test process should be radically changed to gain additional benefits from using the tool.
- C. The target defined for the project was inappropriate, because the automation regime for the automated tests at the end of the pilot is not yet mature.
- D. The approach used for deployed this tool is aligned to the standard success factor for deployment
Answer: D
NEW QUESTION # 67
In order to achieve re-use of a TAS, where SHOULD the design for reuse occur?
- A. At the TAS level
- B. At the code level
- C. At the TAA level
- D. At the framework level.
Answer: A
NEW QUESTION # 68
Your TAS has been running successfully on a Windows/GUI based SUT for some years. The SUT has undergone minimal change over the years to maintain business as usual, deploying six-monthly releases for minor enhancements and bug fixes using a waterfall lifecycle.
The TAS has not changed at all during this period. The current project for the SUT will be using the Scrum methodology to deliver a more modern, competitive, user interface. It is in the release planning stage with an agreed release backlog and set of sprints outlined.
The move from lengthy waterfall releases to shorter sprints has led you to conduct a review of the current TAS to make sure it is robust and fully optimised for the timescale challenges of the new project.
What two steps would be BEST to undertake during the review?
a) Ensure that new automation code is using the same naming conventions as existing code.
b) Perform a full regression run in Sprint 1 to identify what improvements could be made to the TAS for future sprints.
c) Ensure that the TAS is using the latest libraries for the operating system.
d) Review the functions that act upon the controls for the GUI for possible consolidation.
e) Involve the test team to see what ease-of-use improvements they would like to see made to the TAS.
- A. a and b
- B. d and e
- C. b and c
- D. c and d
Answer: C
NEW QUESTION # 69
You are planning the pilot for an in-house developed Test Automation solution (TAS).
Which two of the following would be important steps to take as part of the planning process?
a) Review your organisation's current projects and identify which one would be most suitable to pilot the TAS.
b) Ensure that the developers will provide the necessary commitment for the TAS deployment activities.
c) Run a series of training workshops for new users of the TAS before they are asked to use it.
d) Develop a project plan for the pilot and reserve the necessary budget and resources for its implementation.
e) Ask the developers to provide any missing functionality during the deployment activities.
- A. a and b
- B. c and e
- C. b and d
- D. c and d
Answer: C
NEW QUESTION # 70
You are testing a major enhancement to an air traffic control user interface. You have use of a sophisticated pre-production test environment, created specifically for large scale automated regression, performance and security testing. The window for regression testing is limited and must successfully conclude, with no major regressions remaining, before the non-functional testing starts.
You have been using the same version of the TAS for the last few releases, each time completing the automated regression test suite in a single overnight run. However, due to the latest enhancements for the SUT, you believe there is a risk that the test suite may no longer complete overnight and therefore delay performance and security testing.
Which option would be the BEST and MOST cost-efficient approach to mitigate this risk?
- A. Introduce better coding practices for the automation scripts, including coding guidelines, reviews and improved static analysis.
- B. Analyse the regression test suite and remove test coverage duplication and redundancy.
- C. Create a mirror of the pre-production test environment and split the regression test suite to run in parallel across the environments.
- D. Split the regression test suite into multiple parts, running in the environment across consecutive nights.
Answer: C
NEW QUESTION # 71
Designing the System Under Test (SUT) for testability is important for a good test automation approach and can also benefit manual test execution.
Which of the following is NOT a consideration when designing for testability?
- A. Control: the SUT needs to provide interfaces that can be used to perform actions on SUT.
- B. Observability: The SUT needs to provide interface that give insight into the system.
- C. Clearly defined architecture: The SUT Architecture needs to provide clear and understandable interfaces giving control and visibility on all test levels.
- D. Re-useability: The code written for the SUT must be re-useable for other similar system.
Answer: D
NEW QUESTION # 72
......
ISTQB CT-TAE (Certified Tester Test Automation Engineer) certification exam is a highly sought-after certification for professionals working in the field of software testing. Certified Tester Test Automation Engineer certification is designed to validate the skills and expertise of individuals in the area of test automation. The CT-TAE certification exam is a globally recognized certification that is highly respected in the software testing industry.
Obtaining the ISTQB CT-TAE Certification can provide individuals with many benefits, including increased job opportunities, higher salaries, and recognition in the industry as a qualified test automation engineer. It can also enhance their skills and knowledge in test automation, enabling them to deliver high-quality automated test solutions that meet the needs of their organization. Overall, the ISTQB CT-TAE Certification Exam is a valuable certification for professionals who are serious about advancing their careers in test automation.
CT-TAE Certification Study Guide Pass CT-TAE Fast: https://www.vceengine.com/CT-TAE-vce-test-engine.html
Free CT-TAE Certification Sample Questions with Online Practice Test: https://drive.google.com/open?id=1R8tVodxDbZZMIV0oCkb6ag6V0L_7ESBn
