NEW QUESTION 24
You ran a demand plan and you are reviewing the shipments forecast value measure. It is always zero for a particular item. Identify the root cause of this problem.
- A. In plan parameters, Item List Price marked as primary does not have price defined for the particular item.
- B. In planning measures catalog, shipment forecast measure is not enabled at item and organization level.
- C. In planning measures catalog, shipment forecast value measure is not enabled at item and organization level.
- D. In plan parameters, shipment forecast value measure expression is not defined.
Answer: C
NEW QUESTION 25
Your customer wants to display a numeric measure in both pound and kilogram Units of Measure (UOM) on a table. Describe the configuration steps to display a measure in two UOMs.
- A. Open a table and select Actions, View Table Configuration and click UOM tab. Select primary UOM as pound and secondary UOM as kilogram.
- B. Open a table and select Actions, View Table Configuration and click Measure tab. Find the measure, duplicate the measure, and rename it. Now select pound as UOM for the original measure and kilogram as UOM for the duplicated measure.
- C. Open a table and select View, Format Measures to find the measure. Duplicate the measure and rename it. Now select pound as UOM for the original measure and kilogram as UOM for the duplicated measure.
- D. Open a table and select View, Format Measures to find the measure. Now select pound as primary UOM and kilogram as secondary UOM.
Answer: D
NEW QUESTION 26
Your Procurement Department is getting ready to set up Approved Supplier Lists that will be needed for Supply Planning. They ask you for what you need on the ASLs for planning usage. Which three options are key for planning? (Choose three.)
- A. Make sure to include Maximum Order Quantities.
- B. Make sure to include Minimum Order Quantities.
- C. Make sure they are at a Global level.
- D. Make sure all Local level ASLs include an Organization.
- E. Make sure to include Fixed Lot Multipliers.
- F. Make sure to include Fixed Order Quantities.
Answer: B,C,E
NEW QUESTION 27
Your client uses product categories and global sourcing rules for supply planning. However, their newest product doesn't follow these rules. For a specific item in the category, it needs to be sourced from a different supplier globally.
How should they set this up for the easiest maintenance, going forward?
- A. Create a new global sourcing rule for the item; assign it to the assignment set at the item-organization level; leave the category as is for the remainder of the products.
- B. Create a new local sourcing rule for the item; assign it to the assignment set at the item level; leave the category as is for the remainder of the products.
- C. Create a new global sourcing rule for the item; assign it to the assignment set at the item level; leave the category as is for the remainder of the products.
- D. Create a new global sourcing rule for the item; remove the category level assignments and create new item level assignments for all items in the category pointing each to the correct global sourcing rule.
- E. Create a new global sourcing rule for the item; assign it to the assignment set at the item-organization level; alter the category to be category-organization for the remainder of the products.
Answer: C
NEW QUESTION 28
You have created several infotiles based on the client requirements. You now want to group them together for display. How do you accomplish this?
- A. First build them into a tile set in Manage Table, Graphs, and Analysis Sets. Then open the tile set on the plan by going to Open (choose area) > Choose tile set.
- B. First build them into a planning group in Manage Planning Groups. Then open the planning group on the plan by going to Open (choose area) > Choose planning group.
- C. No need to group them. Open them directly on the plan going to Open (choose area) > Choose Infotile.
- D. First build them into a planning measure in Manage Planning Measures. Then open the planning measure on the plan by going to Open (choose area) > Choose planning measure.
- E. First build them into an info set in Manage Infosets. Then open the info set on the plan by going to Open (choose area) > Choose info set.
Answer: A
NEW QUESTION 29
On the plan page layout that you created, you have several graphs showing the status of the plans and the business. You see a concern in an area and you want to see the data behind it. What navigation should you use to see this data?
- A. Go to Actions > View Data on the graph in question.
- B. You cannot see it on the plan outputs, so you need to go into Planning Analytics and re-search the data.
- C. You cannot see it from the plan landing page, and you will need to search for the data.
- D. On the table in question, go to View > Show table.
- E. You cannot see it on the plan outputs, and you will need to create a new table with the information.
Answer: C
NEW QUESTION 30
The structure of the Plan Summary Layout is a predefined __________.
- A. Set of Infotiles
- B. Material Plan view
- C. Group of Reports
- D. Supply Demand Workbench
- E. Set of Exceptions
Answer: A
NEW QUESTION 31
Which two statements are true when using Measure catalogs? (Choose two.)
- A. The predefined measure catalog is not the system default.
- B. The measure catalog has a collection of measures that you can enable for use in a single plan in the Planning Central work area.
- C. You navigate to Configure Measure Catalogs to edit the Catalog.
- D. You can restrict access to Measure Catalogs using Administer Data Security.
- E. Measure catalogs are defined in the system to improve the performance of the plan.
- F. You can add or remove measures from a measure catalog.
Answer: B,F
Explanation:
Explanation
References:
NEW QUESTION 32
You want to understand what your inventory turns are for your organization. Where can you see this information in Planning Central?
- A. Manage Planning Analytics
- B. Manage Planning Measures
- C. View Planning Analytics
- D. Manage Metrics
- E. Plan Summary
Answer: E
NEW QUESTION 33
Which four types of supplies can be reserved to a sales order in the inventory? (Choose four.)
- A. Purchase requisitions
- B. Purchase orders
- C. Work orders
- D. Transfer orders
- E. On-hand inventory
- F. Planned Orders
Answer: B,C,D,E
NEW QUESTION 34
Which four types of items are eligible to be included as Supply Planned Items in the Supply Plan? (Choose four.)
- A. All sales orders
- B. WIP components
- C. Demand plan items
- D. Purchased Items
- E. Supply plan items
- F. All planned items
Answer: A,B,C,F
NEW QUESTION 35
During Implementation of Planning Central, your client has discovered that no Material Planners have been defined in Manage Material Planners in Planning Central.
In this situation, which three statements are true? (Choose three.)
- A. Planned Orders will not release successfully.
- B. Your client has not been assigned the Material Planner role.
- C. The Planner field will be null for all items.
- D. Collect Planning Data has not been run for Material Planners.
- E. You have not been assigned the Materials Planner role.
Answer: A,B,C
NEW QUESTION 36
Your client wants to create a supply plan that only considers sales order and disregards forecast demand within a specific demand horizon. What must you do to accomplish this?
- A. Manage Plans > Search and select supply plan > Supply tab > General tab > Check Demand Time Fence Control
- B. Manage Plans > Search and select demand plan > Demand tab > General tab > Check Demand Time Fence Control
- C. Manage Plans > Search and select supply plan > Supply tab > Organizations and Schedules tab > Remove all demand schedules
- D. Manage Plans > Search and select supply plan > Supply tab > General tab > Advanced Options > Check 'Create time fence'
- E. Manage Plans > Search and select demand plan > Demand tab > General tab > Select 'Do no spread forecast'
Answer: A
NEW QUESTION 37
Your customer has seasonal demand and wants to generate forecast for next six months. You ran a demand plan for first time using six months of shipments history but the forecast accuracy was low.
Identify two statements that are true in this scenario. (Choose two.)
- A. Running a demand plan with both shipments and seasonal shipments forecast profile is required to forecast seasonal demand.
- B. Running a demand plan with six months of booking history instead of six months of shipment history is required for seasonal demand.
- C. Running a demand plan with less than one year of history will impact seasonal analysis.
- D. Running a demand plan with 18 to 36 months of shipments history is recommended.
- E. Running a demand plan with both shipments and booking forecast profile is required to forecast seasonal demand.
Answer: B,D
NEW QUESTION 38
Identify two ways you can track performance against goals when defining measure goals. (Choose two.)
- A. Value
- B. Aggregation
- C. Range
- D. Specification
- E. Quantity
- F. Attribute
Answer: A,F
NEW QUESTION 39
You are defining material planners for your organization. However, when you go to Manage Material Planners, your organization does not appear in the list of values. Why?
- A. You do not have data access to the organization.
- B. The organization was not enabled for collection under Manage Planning Source Systems.
- C. The organization must be enabled in Manage Planning Profile Options.
- D. The organization is an Item Organization.
- E. The organization must be enabled in Manage Planning Parameters.
Answer: B
NEW QUESTION 40
A customer has created a supply plan based on current requirement. Due to changes in third party forecast, the plan must be rerun with these recent updates. However, while this new information became available, existing supply like on-hand inventory and work order completions have also been updated.
Which data refresh option should be used to reflect all these changes in the plan?
- A. Refresh with current data
- B. Refresh with quick refresh option
- C. Refresh with selected current data
- D. Do not refresh with current data
- E. Refresh with forecast data
Answer: A
NEW QUESTION 41
When analyzing demand fulfillment, what are the three types of recommendations that users can review and accept for expediting? (Choose three.)
- A. Expedite transfer orders
- B. Expedite buy orders
- C. Expedite drop ship orders
- D. Expedite make orders
- E. Expedite make to stock orders
Answer: A,B,D
NEW QUESTION 42
How can you deliver a forecast for drop shipments?
- A. Excel upload using File Based Data Import Process
- B. Create based on the supplier performance for drop shipment collection
- C. Create based on the drop shipment or booking history; the ship from will be the drop ship validation organization
- D. Generate manually using Planning Analytics
- E. It cannot be done at this time.
Answer: C
NEW QUESTION 43
Another planner has previously created a supply plan, but you now need to make some changes so that you can do some 'what-if' analysis. How can you go about duplicating this plan?
- A. Run process "Duplicate supply plans" with existing plan as parameter.
- B. You cannot duplicate a plan that is not owned by you.
- C. Manage Plans > Search and select supply plan > Actions > Duplicate.
- D. You cannot duplicate plans. You must create a completely new supply plan.
- E. Manage Plans > Search and select supply plan > Actions > Edit Plan Options > Select Copy.
Answer: C
NEW QUESTION 44
Should value in Adjusted Shipments Forecast measure always be equal to the Final Shipments Forecast measure?
- A. Yes, if the adjustment is made below the aggregation level at which it is viewed.
- B. Yes,if the demand plan hasn't been run again after adjustment.
- C. Yes,if the adjustment is made at the same aggregation level at which itis viewed, or below.
- D. Yes,if the demand plan is approved and values are locked.
- E. No, both measures will always be different.
Answer: C
NEW QUESTION 45
Your client manufactures consumer electronics and has all facilities live on Oracle Cloud. Their latest product has a very complicated manufacturing process and therefore can only be made at one facility (Organization ABC). However, it is ordered all over the world.
How should the Sourcing Rule be set up to accomplish this?
- A. A global sourcing rule for 100% make at ABC; a local sourcing rule for 100% transfer from ABC
- B. A global sourcing rule for 50% make at ABC and 50% buy from ABC
- C. A local sourcing rule for 100% make at ABC; a global sourcing rule for 100% buy from ABC
- D. A local sourcing rule for 100% make at ABC; a global sourcing rule for 100% transfer from ABC
- E. A local sourcing rule for 100% buy from ABC; a global sourcing rule for 100% transfer from ABC
Answer: E
NEW QUESTION 46
As the planner, you have made some changes to a few of the specifications for items in your simulation sets.
You would like to run one of your existing Demand and Supply Plans that contains this simulation set to see how these changes impact the plan.
Which option shows the steps you must complete in order to ensure that when you run your existing Demand and Supply plan, it contains your changes to the simulation set?
- A. No additional steps are necessary. Any plans that contain your simulation set will automatically be updated with the changes.
- B. When the Demand and Supply Plan is run, verify that 'Refresh with current data' is selected in the Details section.
- C. When the Demand and Supply Plan is run, verify that 'Recalculate Safety Stock' is selected in the Details section.
- D. You are only able to update one item attribute at a time. Since you have changed multiple attributes, you will be unable to update and run this plan.
Answer: B
NEW QUESTION 47
Your clients want to simulate how canceling demand may impact a plan. Which two steps must be done to simulate this change? (Choose two.)
- A. Open plan > View Supplies and Demands > Remove the sales order from the plan and firm demand > Save changes
- B. Open plan > View Supplies and Demands > Firm the demand and set firm quantity to 0 > Save changes
- C. Manage Plans > Edit Plan Options > Add simulation set
- D. Run plan with 'Do not refresh with current data'
- E. Run plan with 'Refresh with current data'
Answer: B,D
NEW QUESTION 48
......